The $21-million seismic refit of the Mission Bridge on Highway 11 was completed to upgrade the earthquake resistance of the structure which included improvements to the resistance of the ground and bridge footings in the event of an earthquake.
FRPD’s scope in this project included the installation of three hundred- and eighty (380) timber compaction piles and seismic drains under the existing bridge.