FRPD was contracted to supply and install a sheet pile cofferdam to facilitate the installation of Granville Island’s new below grade pump station. The cofferdam was designed by FRPD, and included an integrated waler system to maximize structural efficiency of the temporary system and to minimize cost. The project was constructed on an incredibly tight schedule, in this very busy urban centre. FRPD was able to mobilize a 80T crawler crane, via limited access and complete the work without impact on the surrounding environment. Once the installation was complete FRPD removed the temporary works and demobilized from site, leaving the work area as it was preconstruction.