The construction of the 580m long, 6-span Coast Meridian Overpass was recognized as the longest push-launch in North America. Constructed with very limited ground access and without disruption to the CP Rail operations, the 4-lane structure crosses Lougheed Highway and spans 50 parallel sets of tracks in the CP Rail yard.
The construction of the arterial roads and bridge approaches in notably poor soil conditions involved both traditional and innovative ground enhancement techniques.