Fraser River Pile and Dredge was contracted by BC Ferries to perform repairs and replacements to the dolphins on the North Breakwater at Tsawwassen Berth 5 from April to May 2020. The existing dolphins and marine structures required replacements and improvements to protect the vessels during landings.
The existing fender system was upgraded by removing several fender panels and new ones were reinstalled. Each new fender panel weighed 76,000 lbs and was 9.5 m long x 4 m wide. New chains, shackles and tensioners were installed onto the fender system.