RVYC: Jericho Breakwater Replacement Project
FRPD was contracted to remove the aging timber breakwater at the Royal Vancouver Yacht Club’s Jericho facility and construct a new modern breakwater system.
The work upgraded critical harbour protection, improved moorage conditions and enhanced long-term resiliency along the Vancouver waterfront.
Problem
The existing timber breakwater had reached the end of its service life and no longer provided reliable protection against wave action, storms or vessel impacts. Replacing it required careful demolition and removal of creosote-treated timber while preventing debris and contaminants from entering the marine environment. The new breakwater needed a durable, pile-supported design capable of meeting long-term structural and environmental requirements in an exposed coastal setting.
Solution
FRPD delivered the complete demolition and replacement program.
Crews removed and disposed of the existing timber structure and constructed a new pile-supported breakwater featuring large-diameter pile foundations, guide sleeves, precast components and cast-in-place concrete elements.


Key Facts
- Removed and disposed of the existing timber breakwater, including creosote-treated materials
- Installed 106 driven/drilled piles (914-mm diameter) for the new breakwater foundation
- Installed 1,219-mm guide sleeves for alignment and structural support
- Erected precast wall panels along the breakwater face
- Constructed a combination precast and cast-in-place pile cap to complete the new structural system
FRPD’s work delivered a durable, modern breakwater that enhances protection for RVYC members and provides long-term resilience along the Jericho waterfront.