Hamilton Harbour was designated an Area of Concern under the Canada–US Great Lakes Water Quality Agreement due to long-term contamination, degraded water quality, and loss of fish and wildlife habitat. FRPD, in joint venture with Milestone Environmental Contracting, was selected to deliver Stage 2 of the Randle Reef sediment remediation project—one of the largest contaminated sediment cleanup efforts in Canadian history.


Problem

Decades of industrial activity left Hamilton Harbour with heavily contaminated sediments containing PAHs and other toxins. The project required the removal or encapsulation of contaminated material across a large footprint, strict environmental controls, precision dredging and the construction of a secure engineered containment system. Some sediment areas could not be removed and required alternative stabilization methods.


Solution

FRPD–Milestone JV executed a comprehensive sediment remediation program that combined hydraulic and mechanical dredging, a specialized water- treatment plant and sediment capping. FRPD completed this work with a cutter suction dredge capable of hydraulically dredging contaminated material and pumping it via floating pipelines to a 6.2-hectare engineered containment facility (ECF). From this facility the water was treated and released back into Lake Ontario. FRPD also utilized mechanical means for dredging areas of the harbour and for placing capping material.


Key Facts
  • Hydraulically dredged 400,000+ m³ of contaminated sediment using a purpose-built CSD
  • Pumped sediment–water slurry through floating pipelines into the 6.2 ha ECF
  • Treated ECF decant water via a full onsite water treatment system to remove suspended sediment and dissolved contaminants
  • Conducted rigorous sampling and testing before discharge back into the harbour
  • Installed environmental caps and reactive core mats in areas unsuitable for dredging
  • Worked under strict federal and provincial regulations and Great Lakes Water Quality Agreement oversight

FRPD’s specialized dredge, environmental controls and containment systems helped advance one of Canada’s most significant sediment remediation initiatives—improving environmental quality, supporting habitat recovery and contributing to the long-term restoration of Hamilton Harbour.