FRPD participated in the reconstruction of the Centerm terminal on the south side of Burrard Inlet. This project involved a major upgrade to the existing container terminal facility to expand the operating capacity, including both land and marine construction.

FRPD’s scope included the 12M berth extension, dredging to deepen the Berth to minus 15.5m depth, vibro densification and site services.